CAIN-42 MCPGate

AGENTIC AI 75 · #43

Agentic construction scheduling

Trimble connected construction schedules to live jobsite data, weather, RFIs and submittals.

Last reviewed 2026-11-11

Agentic AI 75 / #43

PROPOSEDMoat 5 · Predictive Trust & Blast RadiusBundle · Physical & LabStream 2

2026 status: Product announcement · Category: Construction

The 2026 development

Trimble connected construction schedules to live jobsite data, weather, RFIs and submittals.

The governance gap

A schedule change has cost and safety consequences. An agent reacting to live data needs a model of dependencies and a stop before it moves a safety-critical or contractual milestone.

Where CAIN-42 fits: Moat 5 — Predictive Trust & Blast Radius

Core question: What could happen before we let it happen? Pre-execution analysis of reach, exposure and consequence, including simulations.

Model the schedule as a dependency graph and simulate a proposed change before it is committed. Cost, safety and contractual impact are computed, not inferred from prose.

How the wiring works

  1. Load the current schedule and dependency graph.
  2. Simulate the proposed change and compute impact.
  3. Block changes that move a safety or contractual milestone without approval.
  4. Record the change, the simulation and the approver.

What is real today

PROPOSED A design mapping only. No dedicated implementation exists yet; do not buy this as a finished control.

No construction schedule, jobsite feed or Trimble integration exists here. This is a blast-radius design, not a deployed scheduler.

Component in this repositoryWhat the module says it is
cain/cain_digital_twin.pyCAIN Trust Fabric - CAIN Digital Twin & Blast-Radius Counterfactual Emulator
cain/argus/path.pyCAIN ARGUS — execution-path assurance (Prompt 14, section 7).
cain/causality/graph.pyCAIN CAUSALITY — Causal Event Graph (Prompt CAUSALITY, Phase 3).

Descriptions are the first line of each module's own docstring, read without importing it. A module path is a pointer into this repository, not a hosted endpoint. Its existence is checked by the test suite; its status for this use is the label above.

Check it yourself

Commercial package

OfferPhysical Schedule Assurance Review
BuyerConstruction-technology vendors and contractors
Price (proposal)Advisory from $10,000
BundlePhysical & Lab — A validity check between the plan and the machine.
Operator streamStream 2 of the 10-stream operator playbook

Lab automation, robotics, industrial operations, construction technology is the bundle buyer. The entry offer for this bundle is Physical-action assurance review (advisory, simulation-first); the range is $5,000–$15,000 per engagement. A price on this page is a proposal, not a validated rate, and no customer is claimed.

Buy this as a product or service

CAIN-A75-043 — Physical Schedule Assurance Review DELIVERABLE

A bounded engine run on the buyer's sample: findings, a written report, and a SHA-256 artifact manifest. The manifest is unsigned: it is not a signature and not an attestation.

Kind: Assessment · Price (proposal): Advisory from $10,000 · Lead time: 5 business days.

Open the product page · all 75 products

What this page does not claim

What this page is not. CAIN-42 is not affiliated with, endorsed by, integrated into, or shipped with the organisation named in the 2026 item. The item is public context; the page describes how CAIN-42 would govern that class of capability. No page here claims a customer, a partnership, a certification, a patent, or a production integration. Prices are proposals. Built by a three-person team.

← #42 Continuous creative-production agentsAll 75#44 Evidence-based construction change orders →