AGENTIC AI 75 · #44
Evidence-based construction change orders
Trimble described agents drafting potential change orders from contracts, drawings and project records.
Last reviewed 2026-11-11
Agentic AI 75 / #44
2026 status: Product announcement · Category: Construction
The 2026 development
Trimble described agents drafting potential change orders from contracts, drawings and project records.
The governance gap
A change order is a financial and contractual instrument. The agent's draft must show which clause, drawing revision and record supports each line, and a human must own the approval.
Where CAIN-42 fits: Moat 4 — Execution Provenance & Attestation
Core question: Can we prove what actually happened? Hash-chained, signed records binding decision to execution to observable effect.
Build the change order as an evidence-backed claim: each line cites a document, a revision and a reviewer. The signed package preserves the source hashes and the approval chain.
How the wiring works
- Extract each line item and cite its source document and revision.
- Flag unsupported or conflicting citations.
- Require a human reviewer for each financial line.
- Sign the package and preserve the source hashes.
What is real today
PROPOSED A design mapping only. No dedicated implementation exists yet; do not buy this as a finished control.
No contract or drawing ingestion exists in this repository. Do not treat this page as legal or contractual advice.
| Component in this repository | What the module says it is |
|---|---|
cain/worm_export.py | CAIN Trust Fabric - tamper-evident WORM Causal Evidence Fabric (Phase 4) |
cain/causality/graph.py | CAIN CAUSALITY — Causal Event Graph (Prompt CAUSALITY, Phase 3). |
cain/compliance.py | CAIN Trust Fabric - Regulatory Compliance & Certification Engine (Phase 4) |
Descriptions are the first line of each module's own docstring, read without importing it. A module path is a pointer into this repository, not a hosted endpoint. Its existence is checked by the test suite; its status for this use is the label above.
Check it yourself
- Inspect a live signed evidence package
/product-demo - Fire a live decision through the CAIN-42 pipeline
/fabric/try— the same enforcement path every product sits behind.
Commercial package
| Offer | Contract Evidence Review |
|---|---|
| Buyer | Construction and legal operations teams |
| Price (proposal) | $7,500–$15,000 per engagement |
| Bundle | Physical & Lab — A validity check between the plan and the machine. |
| Operator stream | Stream 4 of the 10-stream operator playbook |
Lab automation, robotics, industrial operations, construction technology is the bundle buyer. The entry offer for this bundle is Physical-action assurance review (advisory, simulation-first); the range is $5,000–$15,000 per engagement. A price on this page is a proposal, not a validated rate, and no customer is claimed.
Buy this as a product or service
CAIN-A75-044 — Contract Evidence Review DELIVERABLE
A bounded engine run on the buyer's sample: findings, a written report, and a SHA-256 artifact manifest. The manifest is unsigned: it is not a signature and not an attestation.
Kind: Evidence Pack · Price (proposal): $7,500–$15,000 per engagement · Lead time: 5 business days.
Open the product page · all 75 products
What this page does not claim
What this page is not. CAIN-42 is not affiliated with, endorsed by, integrated into, or shipped with the organisation named in the 2026 item. The item is public context; the page describes how CAIN-42 would govern that class of capability. No page here claims a customer, a partnership, a certification, a patent, or a production integration. Prices are proposals. Built by a three-person team.